![](../I/Waltz_and_Reece_Cut_-_from_top_of_cut_-_Lackawanna_Cut-Off_-_April_13_2012.jpg.webp)
Deepest part of the Waltz & Reece Cut (2012 photo)
Waltz & Reece Cut is the deepest cut on the Lackawanna Cut-Off railroad line in northwest New Jersey. The cut is 0.68 miles (1.09 km) long, has an average depth of 37 feet (11 m), and a maximum depth of 114 feet (35 m).
Located between mileposts 48.3 and 49.0 in Byram Township, it sits on a tangent (straight) section of right-of-way just west of McMickle Cut and just east of Bradbury Fill.[1]
It was built between 1908 and 1911 by Waltz & Reece Construction Company, which removed 822,400 cubic yards of fill material by blasting with dynamite or other methods.[2] The line was abandoned in 1983.
In 2012, a single track was relaid through the cut as part of NJ Transit's plans to restart rail service no earlier than 2021.
![](../I/Waltz_and_Reece_Fill_-_April_1910.jpg.webp)
This April 1910 construction photo shows a narrow-gauge train hauling fill material to the top of Waltz & Reece Fill. Waltz & Reece Cut is visible to far left; the top of Roseville Tunnel at center, on the horizon.
References
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.